JSW Energy Boosts Storage Capacity in Rajasthan

  Published 1 year ago

JSW Energy develops a 12-year BESS in Rajasthan with tariff and VGF, aiming for 40 GWh by 2030.

  • Builds 29.3 GWh storage, including 2.9 GWh BESS and 26.4 GWh Pumped Hydro.
  • Targets 40 GWh capacity by 2030 via BOO model and viability gap funding.
  • Leading power producer with diversified assets in generation and transmission.

You might like these

Sterling Gtake EV Chargers Launch India

India Manufacturing Hits 17-Year High

Epack Prefab Shares Strong Debut

Macy's Q1: Sales Dip, Outlook Trimmed

Hikal FDA Inspection OAI Update

MobiKwik Q1 Loss, Sales Drop, ADIA Exit

Atul Auto Reports Strong Growth in FY25

News that matters the most ⚡