JSW Energy Boosts Storage Capacity in Rajasthan

  Published 11 months ago

JSW Energy develops a 12-year BESS in Rajasthan with tariff and VGF, aiming for 40 GWh by 2030.

  • Builds 29.3 GWh storage, including 2.9 GWh BESS and 26.4 GWh Pumped Hydro.
  • Targets 40 GWh capacity by 2030 via BOO model and viability gap funding.
  • Leading power producer with diversified assets in generation and transmission.

You might like these

EPFO April 2025 Payroll: 19.14 Lakh New Members Added

Muthoot Capital Q2 FY26 Highlights

Entero Healthcare Shares Fall on Downgrade

Solar EV Boost: Servotech in Mauritius

RVNL Wins Signaling & Telecoms Project

India Shines in Sustainability Drive

India: The Next Maritime Powerhouse

News that matters the most ⚡